Regional Rail Planning

In September 2007, the Metropolitan Transportation Commission (MTC) adopted the Regional Rail Plan.   This comprehensive planning document maps out a 50-year strategy to improve and expand both passenger and freight rail services in the 9-county Bay Area.  With freeway congestion, commute patterns and climate change emerging as growing concerns, the development of convenient, efficient rail service is a key element to addressing the Bay Area’s current and future transportation needs. 

The Regional Rail Plan is the result of efforts by MTC, BART, Caltrain and a coalition of passenger and freight operators.  It looks at improvements and extensions of railroad, rapid transit, bus connections and high-speed rail services for the near (5 to 10 years), intermediate (10 to 25 years), and long-term (beyond 25 years).  A copy of the Draft Regional Rail Plan including these recommended improvements, can be viewed on MTC’s website.

The adoption of the Regional Rail Plan coincides with efforts by the California High Speed Rail Authority (CHSRA) to assess the feasibility of a statewide high speed rail system and in particular, to identify a route for bringing high speed rail service into the Bay Area.

High Speed Rail in California

With a motto of “Fly California without ever leaving the ground,” the CHSRA envisions high-speed trains capable of maximum speeds of up to 220 miles per hour with an expected trip time from San Francisco to Los Angeles in just over two hours and 30 minutes.  In November 2008 California voters approved Proposition 1A, a $10 billion bond initiative to fund the first phase of this 700-mile system that will ultimately extend from Sacramento to San Diego. 

In November 2005 the CHSRA certified the program-level Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the statewide high speed rail system.  CHSRA is currently preparing a program-level EIR/EIS analyzing high speed rail alignments providing service from the Central Valley to the Bay Area.   In December 2007, CHSRA recommended the “Pacheco” Alignment to bring express high speed rail service from Merced (in the Central Valley) to the South Bay serving San Jose, and San Francisco.  The Authority also recommended significant improvements to existing regional commuter rail services through the “Altamont” Alignment to increase service speed and frequency from the San Joaquin Valley through the Tri-Valley and into the greater Bay Area.  The Regional Rail Plan supports this approach and includes a recommendation for a BART extension to Livermore with connections to the enhanced commuter rail service and/or high speed train service.

What’s Next

BART is the lead agency working with Livermore and other regional transportation agencies on a program-level environmental impact report (EIR) of alignments for an eastward BART extension from the Dublin/Pleasanton station.  Study alternatives include multi-modal station connections with enhanced commuter rail and express bus services.  The draft EIR will be released for public review and comment on November 6, 2009.  Click on our BART to Livermore page or on info@barttolivermore.org for information on scheduled public meetings, or to link to a copy of the draft EIR.

Livermore and the TRWG are also working with CHSRA and various governmental agencies from Sacramento to Bakersfield as the “Altamont Corridor Partnership”.  The purpose of the Partnership is to identify and prioritize rail improvements through the Altamont Corridor (between the Central Valley and Tri-Valley areas) that will result in faster, more frequent rail service with potential connections to High Speed Rail and BART, and express bus service. 

MEETING NOTICE:  The High Speed Rail Authority will host a series of scoping meetings to solicit public input on the Altamont Corridor Rail Improvements project.  The public is invited to come talk with project planners, view information exhibits and videos, and share suggestions about potential routes, stations, and more. The meetings will be an ‘open house’ format, with information displays and staff on hand to answer questions and take suggestions.  Click here to view an informational flyer regarding the proposed project.  All meetings are open from 3:00 p.m. to 8:00 p.m. The scheduled meetings and locations are as follows:

Public Scoping Meetings
November 10, 2009 November 12, 2009 November 17, 2009 November 18, 2009
Robert Livermore Community Center San Joaquin Council of Governments Fremont Teen Center Le Petit Trianon Theatre
4444 East Avenue 555 E. Weber Avenue 39770 Paseo Padre Parkway 72 North Fifth Street
Livermore, CA Stockton, CA Fremont, CA San Jose, CA
All meetings from 3:00 p.m. to 8:00 p.m.

 

Refer to this site for future project updates and meeting notices.  For more information, please contact Ken Ross, Senior Civil Engineer, City of Livermore Engineering Division, at 925-960-4500, or via email at keross@ci.livermore.ca.us